2
|
Area
|
2.1. Planning areas
+ Phase I&II: 196,75 ha
+ Phase III: 49,17 ha
+ Phase IV: 515,3 ha
2.2. Practical area: 421,9 ha
2.3. Occupancy rates:
2.3.1. Phase I&II:
+ Industrial land: 143,39 ha (72,87%)
+ Commerce - services land: 4,96ha (2,52%)
+ Tree covered land: 19,72 ha (10,02%)
+ Internal road: 23,02 ha (11,71%)
+ Others: 5,66 ha (2,88%)
2.3.2. Phase III:
+ Industrial land: 18,64 ha (37,9%)
+ Commerce - services land: 3,01 ha (6,1)
+ Tree covered land: 17,7 ha (36%)
+ Internal road: 9,82 ha (20%)
+ Others:
2.3.3. Phase IV:
+ Industrial land: 297,16 ha (57,8%)
+ Commerce - services land: 14,81 ha (2,87%)
+ Tree covered land: 72,238 ha (14%)
+ Internal road: 53,66 ha (10,4%)
+ Others: 52,04 ha (10%)
|
5
|
Infrastructure
|
5.1. Power supply: 02 substations 110/22KV-25 MVA
5.2. Water supply and drainage system: Phu Bai Plant with the capacity of 15.000m3/day. D50 water supply system serving the industrial zone.
5.3. Sewage and waste treatment system Sewage treatment plant with the capacity of 6.500m3/day.
5.4. Telecommunication and internet system: Phone, television and Internet system available, using underground cable.
5.5. Fire prevention system: Fire police station with 3 fire trucks and fire hydrants.
5.6. Internal traffic Primary arterial road which is 31m - 54m wide; internal road and frontage road which are 31m - 54m wide
5.7. Transport
+ Land and railway: Phu Bai Industrial Zone is located along the National Highway 1A and the North-South railway,
+ Waterway (sea, river): About 40km from Chan May sea port.
+ Air way: Near Phu Bai International Airport
5.8. Infrastructure investment Technical infrastructure has already been completed.
|
7
|
Social infrastructure
|
7.1. Institutions: there are 09 universities, 01 academy, 06 colleges, 07 professional secondary school and many other vocational training establishments.
7.2. Security: About 3km from Huong Thuy town’s Public Security Station and 1km from Phu Bai ward’s Public Security Station
7.3. Hospital: About 2km from Huong Thuy General Hospital. About 214,5 km from Hue Central Hospital.
7.4. Worker accommodation Worker accommodation has already been planed. Its total area is 53,6 ha
|
8
|
Supporting services
|
8.1. Logistics and transport: Transport and logistic services meeting investor’s requirements.
8.2. Finance - bank - insurance: Big banks such as Vietcombank, Vietinbank, BIDV, Agribank, Sacombank, and so on are located by the industrial zone.
8.3. Customs area: Thuy An Customs Branch are situated in the industrial zone. The bonded warehouse is available for storage.
|
9
|
Investor attraction
|
High technology, information technology, clean technology, auxiliary technology, mechanism, automobile assembling, motorbike assembling, soft drink, etc.
|
10
|
Land leasing fee, workshop leasing fee and infrastructure use expense
|
10.1. Land leasing fee USD 28/m2/38 years (1st and 2nd phase)
10.2. Method of payment: paid once only
10.3. Infrastructure use expense USD 0,19/m2/year
10.4. Method of payment: yearly paid
|
12
|
Investment fee (reference)
|
12.1. Electricity price Yearly regulated by Commerce and Industry Ministry
12.2. Water price
+ Manufacturing: VND 11.081/m3
+Business and service: VND 15.610/m3
12.3. House and apartment leasing price applied to foreigner:
12.4. Labor expense
+ Minimum salary: VND 3,090 million/month
+ Primary labor: 4,5 - 5,5 million dong/month
+ Technician laborers: 6 - 8 million dong/month
+ Managers: 8 - 12 million dong/month
+ Over time salary As generally regulated
+ Social insurance: 25% (17% is charged by businesses, the rest is paid by employees)
+ Health insurance: 4,5% (businesses: 3%, employees: 1,5%)
+ Unemployment insurance: 2% (businesses: 1%, employees: 1%)
12.5. Sewage treatment expense: VND 6.257/m3 (VAT excluded)
Notes: In case of various prices available, the average price in the area or entire province/city is used.
|